Brochure LTI_ING - La Toscana impianti
Transcript
Brochure LTI_ING - La Toscana impianti
La Toscana Impianti is an Italian Company, it’s working in the industrial plants for forty years and more. It’s the best partner, to plan and carry out the installation, the management and the maintenance of several kinds of Industrial Plants. Best qualitative standards are assured,la toscana Impianti propose herself Main Contractor managing all project steps. We works in: – Chemical industries. – Petrochemical industries. – Iron industries. – Thermo-electric industries. – Energy & Environmental industries. – Ceramic industries. – Pharmaceutical and Alimentary Industries. – Paper industries. Offers a great number of services as: - Mechanical and Electro-Instrumental Engineering Precision Mechanical Manufacture Plastic Manufacture Ebonite and Rubber Covering Electro-Instrumental works Protective Treatments Not destructive checks Thermal Treatments Thermal insulations Civil Engineering Electro-Instrumental Assembling Mechanical Maintenance Multi-specialistic Maintenance Diagnostic Activities Main Products - Piping Carpentries Pressure Vessels Heat Exchangers Deareators Package Plants Storage Tanks La Toscana Impianti, certified ISO 9001, has made of its products and services quality a winning bet! Standards La Toscana Impianti works fully respecting standars which can guarantee its realizations, quality and safety, as : I S P E S L - A S M E - T E M A - A P I - R I N A - LL R The variety and the level of Its own customers let La Toscana Impianti to gain the higher standards in safety field. La Toscana Impianti today is able to manage with its own human resources: - Safety Plan - Executive Safety plan (Law n°494) - Risk Analysis - Assembling and Shut-down job co-ordination - Staff Training - Internal Auditing - Accident Analysis - Internal Safety magazine - Non-Accident Managing - Managing of Statistics Indexes TF0 e Tf1 Commessa: S3799 Cliente: Nuovo Pignone Prefabbricazione e Montaggio Piping A/P per Impianto di Recupero “TAR”. Raffineria SARAS - IGCC SARLUX Sarroch (CA). Job: S3799 Customer: Nuovo Pignone Prefabrication and Erection of HP Piping for “TAR” Recovery Plant SARAS Refinery - IGCC SARLUX Sarroch (CA). Commessa : 3946 Cliente: Lucchini S.p.A. Montaggi Meccanici Impianto Captazione scorie metalliche; Costruzione Piping e Montaggio Meccanico Elettrofiltri Piombino (LI) Job: 3946 Customer: Lucchini J.S.C. Metallic Slag Collection Plant Erection; Piping Constrution and Electrostatic Precipitators Mechanical Erection Piombino (LI) Commessa: 3138 Cliente: Solvay Poliolefyns Europe S.p.A. Progettazione e Fornitura in Opera Impianto Stoccaggio Pellets Nero Rosignano Solvay (LI) Job: 3138 Customer: Solvay Poliolefyns Europe S.p.A. Design, Supply and Erection on Site Black Pellets Plant Rosignano Solvay (LI) Commessa : 3946 Cliente: Lucchini S.p.A. Montaggi Meccanici Impianto Captazione scorie metalliche; Costruzione Piping e Montaggio Meccanico Elettrofiltri Piombino (LI) Job: 3946 Customer: Lucchini J.S.C. Metallic Slag Collection Plant Erection; Piping Constrution and Electrostatic Precipitators Mechanical Erection Piombino (LI) Commessa: 3984 Cliente: Marangoni Tyre S.p.A. Montaggio e Parziale Fornitura Impianto Termodistruzione Pneumatici Anagni ( LT ) Job: 3984 Customer:Marangoni Tyre J.S.C. Erection and Partial Supply Tyres Incinerator Plant Anagni ( LT ) Commessa: 3619 Cliente: Colorobbia Italia S.p.A. Progettazione e Fornitura in Opera Impianto Stoccaggio Materie Prime Empoli (FI) Job: 3619 Customer: Colorobbia Italy J.S.C. Design, Supply and Erection on Site of Storage Plant Empoli (FI) n° 37 Sili Capacità 60 m3 N° 37 Silos. Capacity 60 m3 n° 50 Sili Capacità 20 m3 N° 50 Silos. Capacity 20 m3 n° 35 Sili Capacità 4 m3 N° 35 Silos. Capacity 4 m3 Capacità di Stoccaggio Totale 3360 m3 Total Storage Plant Capacity c.m.3360 Commessa: 3779 Cliente: Jordan Technologies Impianto Package Recupero Vapori Benzine Job: 3779 Customer: Jordan Technologies Gasoline Vapor Recovery Package Plant Dia. Nom. 3.000 Alt. 5.600 Mat. A 516 Gr. 70 Press. 1.75 Bar Temp. 148°C Norme/Standard ASME Nom. Dia. 3.000 Height 5.600 Mat. A 516 Gr. 70 Press. 1.75 Bar Temp. 148°C Standard ASME Commessa: 3737 Cliente: Solvay Chimica Italia S.p.A. Realizzazione e montaggio Impianto Debicarbonatazione completo di colonna debicarbonatore - DCB7 Rosignano Solvay ( LI) Job: 3737 Customer: Solvay Chimica Italia J.S.C. Supply and erection of Debicarbonator Plant complete of debicarbonator column Rosignano Solvay ( LI) Diametro nominale 4.500 / 3.000 mm Lunghezza: 30.000 mm Materiale: Avesta 904L Pressione: 0.45 Bar Temperatura: 140°C Capacità: 130.000 litri Peso: 91.000 Kg. Norma: ISPESL Nominal Diameter: 4.500 / 3.000 mm Lenght: 30.000 mm Material: Avesta 904L Pressure: 0.45 Bar Temperature: 140°C Capacity: 130.000 litri Weight: 91.000 Kg. Standard : ISPESL Commessa: 4137 Cliente: Dow Italia S.p.A. Serbatoi Stoccaggio Butadiene Job: 4137 Customer : Dow Italia J.S.C. Butadyene Storage Tanks Diametro nominale: 4.000 mm Lunghezza: 22.000 mm Materiale: Fe510.2.Kw Pressione: 0.7 Mpa Temperatura: 200°C Capacità: 263.815 l Peso: 43.000 Kg. Norme: ISPESL Nominal diameter: 4.000 mm Lenght: 22.000 mm Material: Fe510.2.Kw Pressure: 0.7 Mpa Temperature: 200°C Capacity: 263.815 l Weight: 43.000 Kg. Standards: ISPESL Commessa: 4138 Cliente: Dow Italia S.p.A. Batch Stripper Job: 4138 Customer: Dow Italia j.s.c. Batch Stripper Commessa: 3322 Client: Carbochimica Italiana S.p.A. Fusore Pece Y1102 Job: 3322 Customer: Carbochimica Italiana J.S.C. Pitch Founder Item Y1102 Diametro nominale: 4.500 mm Lunghezza: 6200 mm Materiale: Aisi 316 L Pressione: 0.49 Bar Temperatura: 600°C Capacità: 69.000 l. Norme: ISPESL Nominal Diameter: 4.500mm Length: 6.200 mm Material: Aisi 316 L Pressure: 0.49 Bar Temperature: 600°C Capacity: 69.000 l. Standard: ISPESL Diametro nominale: 4972 mm Lunghezza: 12.100 mm Materiale: Aisi 316L Pressione 0.34 Mpa Temperatura: 20°C / 200°C Capacità: 138.000 l. Peso: 28.000 Kg. Norme: ISPESL Nominal Diameter: 4972 mm Length: 12.100 mm Material: Aisi 316L Pressure: 0.34 Mpa Temperature: 20°C / 200°C Capacity: 138.000 l. Weight: 28.000 Kg. Standards: ISPESL Commessa: 4214 Cliente: DCM (Delta Costruzioni Meccaniche) Realizzazione chiavi in mano di 6 Fermentatori Job: 4214 Customer: DCM (Delta Costruzioni Meccaniche) 6 Fermentators “Turnkey” job Diametro nominale: 3900mm Altezza: 12.500 mm Materiale: Aisi 304 Pressione di bollo: 9 bar Temperatura: 160°C Capacità: 120.000 l. Peso: 40.000 Kg./Cad Nominal Diameter: 3900 mm Length: 12.500 mm Material: Aisi 304 Pressure: 9 bar Temperature: 160°C Capacity: 120.000 l. Weight: 40.000 Kg. Commessa: 4328 Cliente: Rhodia Italia Fornitura chiavi in mano di Atomizzatore Spry Dryer (progettazione, costruzione e montaggio) Diametro nominale: 8.900/4.500 mm Altezza: 21.300 mm Materiale: Avesta 153 MA/Aisi 304 Pressione di bollo: -0,02 Bar Temperatura: 150°C / 750°C Capacità: 820.000 Litri Norme di costruzione: VSR/PED Job: 4328 Customer: Rhodia Italia Atomizator Spry Dryer “Turnkey” job Nominal Diameter: 8.900/4.500 mm Length: 21.300 mm Material: Avesta 153 MA/Aisi 304 Pressure: - 0.02 bar Temperature: 150°C / 750°C Capacity: 820.000 l. Standards: VSR/PED Commessa: 3593 Cliente: Techint S.p.A. Progettazione e Fornitura Scambiatori di Calore Impianto SCOT Agip Petroli Livorno Job: 3593 Customer: Techint J.S.C. Design and supply of Heat Exchangers FOR Scot Plant Agip Petroli refinery of Livorno. Commessa: 4337 Cliente: Solvay Chimica Italia S.p.A. Progettazione e Realizzazione di “Nuovo Fondo Filtro D910” Impianto Vinyloop Stab.to di Ferrara Job: 4337 Customer: Solvay Chimica Italia J.S.C. Design and full realization of “New Filter D910” for Vinyloop Plant Ferrara Plant Job: 4310 Customer: ANSALDO ENERGIA jsc Material : ASTM A 335 P91 Cogeneration Power Plant of Ferrera Erbognone (PV - ITALY) Piping MAIN MATERIALS 9 ASTM A106 gr. B 9 ASTM A 335 P5 9 ASTM A 335 P9 9 ASTM A 335 P 11 9 ASTM A 335 P 12 9 ASTM A 335 P 22 9 ASTM A 335 P 91 9 ASTM A 312 TP 304L 9 ASTM A 312 TP 316 L 9 ASTM A 312 TP 316 Ti 9 ASTM A 312 TP 321 9 DUPLEX STEEL 9 9 9 9 9 9 SAF 2205 SUPERDUPLEX STEEL SAF 2507 AVESTA 904L MONEL 400 INCONEL 600 INCONEL 800 TITANIUM ASTM B338 GR.2 Multi-disciplinary and pluriannual contracts La Toscana Impianti as team leader, manage from many years aggregation of specialised company to secure its customers with: - Management simplification with only one interface. Human resources optimisation. Reduction of maintenance's cost. Customer's responsibility of management exemption (delegation). Reduction of management's cost(working with only one contract). Reduction of industrial accidents. Improvement in the answer time and quality improvement. Mechanical and Electro-Instrumental Maintenance / Quick Service La Toscana Impianti is able to guarantee routine, planned and extraordinary maintenance, shut down jobs and quick service. Reactivity, quality and reliability are heritage of all the staff of La Toscana Impianti that always put, as its main objective, the customer satisfaction. Global Service La Toscana Impianti participate in the management of avant-garde Global Service agreements. The main objectives of this kind of agreements are: - Reduction of maintenance cost. Efficiency improvement. Improve plants availability. Safety improvement. Flexibility and more control of budgets. The instruments to reach the target are: - Professional Training / Information - High quality assurance - N/C and A. C. treatments - Optimisation of activity with a maintenance plan which foresee: A) Management of technical documents. D) Analysis and management of critical phases. E) Preventive maintenance plan. - Optimisation of reliability and availability plan - Cost analysis NAME : La Toscana Impianti LTD ADDRESS : Via della Villana 154 ROSIGNANO SOLVAY LIVORNO (LEGHORN) ITALY POST CODE 57013 TEL.NUM: 00390586790207 FAX.NUM: 00390586790588 WWW.latoscanaimpianti.it La Toscana Impianti has been certificated UNI EN ISO 9001 (Certification n. SQU182AQ193/1) ANSALDO ENERGIA S.p.A. Genova ANSALDO CALDAIE S.p.A. Legnano (MI) APS Engineering Company Roma Roma COLOROBBIA ITALIA S.p.A. Empoli (FI) BALCKE MARLEY ITALIA S.p.A. Arona COMMISSIONING ITALIA S.p.A. Milano DCM S.r.l. Misinto (MI) DOW ITALIA S.p.A. Livorno/Milano ENEL S.p.A. Pisa ENI - AGIP PETROLI S.p.A. Roma ENI - AGIP PETROLI S.p.A. Livorno ENI - AGIP PETROLI S.p.A. Fornovo (PR) ENI - AGIP PETROLI S.p.A. San Nazzaro (PV) ENI - AGIP PETROLI S.p.A. Taranto ENI - AGIPGAS S.p.A. Roma JOHN M HENDERSON & CO LTD Arbroath Scotland KNAUF INTERNI Castellina Marittima (PI) INDUSTRIE BITOSSI 90 S.p.A. Sovigliana Vinci (FI) LA MAGONA D'ITALIA S.p.A. Piombino (LI) LUCCHINI S.p.A. Piombino (LI) LAIP S.p.A. Prato MARANGONI IMPIANTI S.p.A. Rovereto (TN) NUOVO PIGNONE S.p.A. Firenze ORANE S.p.A. Milano RAFFINERIA DI ROMA Roma REIMPSI Cecina (LI) ROSEN S.p.A. Rosignano Solvay ROSELECTRA S.p.A. Roma RHODIA ITALIA S.p.A. Milano SAIPEM S.p.A. S.D. Milanese (Mi) SAMMONTANA S.p.A. Empoli (Fi) SOLVAY CHIMICA ITALIA S.p.A. Rosignano Solvay SCA PACKAGING ITALIA S.p.A. SOLVAY CHIMICA ITALIA (LI) (LI) Porcari (LU) S.p.A. Rosignano Solvay SIIRTEC NIGI S.p.A. Milano SUDPROGETTI s.r.l. Siracusa TAMOIL RAFFINAZIONE SpA Cremona (LI) S.H.E.Q. an d so c ial ac c o u n t abil it y in t eg r at ed man ag emen t “Social Accountability” Cer tificate SA 8000-2001 “Envi ronment al ” Certificate ISO 14001-2004 “Safety & Health” Certificate OHSAS 18001-1999 “Quality” Certificat e UNI EN ISO 9001: VISION 2000
Documenti analoghi
il gruppo solvay in italia
‘Vento di evoluzione’ è il titolo che
accomuna il sito web e questa brochure e soffia per tutti: clienti, partner, istituzioni, collettività e collaboratori.